Quality & supplier control

Evidence before release.

PartVerity connects supplier selection, drawing revision, inspection scope and shipment disposition in one visible project-control record.

Control principles

Quality is designed into the decision path.

The website does not promise a universal quality level. The accepted requirement, selected supplier, production route and inspection plan define what evidence a project needs.

01

Supplier qualification

Qualification is project-specific. We consider process and equipment fit, material experience, measurement capability, document control, capacity, communication and corrective-action response. Qualified means accepted for a defined scope—not universally approved for every process or industry.

Open control topic
02

First Article Inspection

Where included, FAI can contain a ballooned drawing, dimensional results, deviations, material or finish evidence and identified measurement methods. Production release follows the agreed customer disposition.

Open control topic
03

Inspection planning

Reports are tied to the drawing revision and agreed characteristic list. A sample measurement report is not represented as 100% inspection unless that level is specified in the project scope.

Open control topic
04

NCR & corrective action

Containment, correction, authorised disposition and corrective action remain separate decisions. Changes after release require documented impact review and approval before affected work proceeds.

Open control topic

Inspection process

The drawing drives the inspection plan.

The release sequence stays connected to critical characteristics and the accepted project scope.

01

Critical-characteristic review

02

Inspection plan

03

First-off / FAI

04

In-process checks

05

Final inspection

06

Documented disposition

07

Shipment release

Material documents, finish certificates, inspection records or third-party checks are supplied only when included in the agreed project scope. Regulated-industry claims require project-specific verification.

Define the evidence

Include criticality and tolerance expectations in your RFQ.